OPTIONS
  • 1. Ezfit can be installed loose-lay with two-sided tape or release adhesive glue around the perimeter of the room.
  • 2. Ezfit can be installed full spread with release adhesives such as Mapei Eco 350 or Henry’s 810.
  • 3. For heavy duty commercial applications, Ezfit can be glued down permanently with Mapei Eco 360 or Henry’s 422.
  • 4. For installation over radiant heat, we recommend to use the permanent glue method.