PREPARATION

The material must be allowed to acclimatize at room temperature (approx 20 ˚C) for 48 hours prior to installation. New concrete floors need to dry out for at least 60 days prior to installation. Make sure the floor is smooth, clean, and free of wax, grease, oil or dust. Uneven areas must be fixed with a proper leveling compound.

Leave a Reply

Your email address will not be published. Required fields are marked *


5 + nine =